Pipeline construction

Contact International is one of the leaders in the market for the construction of pipeline transport systems in the Khanty-Mansi Autonomous Okrug. For more than 17 years, we have been successfully working and performing complex work on the construction of pipelines for oil refineries of medium and large businesses in the Ural Federal District.

What we can:

implementation of complex and large-scale projects
implementation of projects in difficult climatic conditions
mechanical repair shop
turnkey pipeline construction
inspection and evaluation of completed work

Pipeline construction is carried out using manual welding (from 89 mm to 530 mm) or an automatic complex (530-1420 mm)

The advantage of Contact International is its own fleet of vehicles, which consists of 148 units of tracked and wheeled vehicles. This allows construction and installation work to be carried out simultaneously at several fields, including: Zapadno-Ust-Balyksky, Taylakovsky, Achimovsky, Aganskoye, Novo-Pokurskoye, Kharampusk, Arigolsky.

When constructing linear pipelines, we carry out in stages:

Preparation of right-of-way for construction and installation work (construction and installation work)
Delivery of the pipeline to the route
Thread welding
X-ray control
Insulation of welded joints
Complex of earthworks
Installation of pipeline valve units
Pipeline testing
Commissioning of the facility

Our projects:

1) Oil pipeline of the booster station of the Chistinnoye oil field - oil treatment unit of the Novo-Pokurskoye oil field. Length: 43,075 km.

2) Gas pipeline for the Taylakovskoye field. The gas pipeline was built in 3 months in swampy and difficult terrain. Length: 41 km.

3) Gas pipeline for the Zapadno-Ust-Balykskoye field. Length: 36 km.

4) Pressure oil pipeline of the UPN-Arigolskoye field (with an underwater passage). Length: 21 km.